Client

L.U. Simon Builders

Collaborators

ARM Architecture

Timeline

Started

Dec 2013
-
Feb 2015

About The Project

Entrada Systems was engaged to design, fabricate, and install a comprehensive façade package for both buildings, including:

  • 995 m² of aluminium windows and doors
  • 165 linear metres of aluminium feature fins
  • 50 m² of aluminium batten screens
  • 270 m² of plant room louvres

These elements were meticulously crafted to meet stringent aesthetic and performance criteria, aligning with the project’s architectural vision.

KEY FEATURES:

  • Aluminium Windows & Doors: Engineered for durability and thermal efficiency, accommodating both single and double-glazed units.
  • Aluminium Feature Fins: Installed to add depth and texture to the façade, creating dynamic visual interest and reinforcing the building’s contemporary design language.
  • Aluminium Batten Screens: Designed to provide privacy and solar control while enhancing the building’s visual appeal.
  • Plant Room Louvres: Installed to ensure adequate ventilation and concealment of plant equipment, contributing to the building’s sleek façade.

PROJECT HIGHLIGHTS:

The successful execution of the façade works contributed to the timely completion of the Orbis and Momentum Apartments in 2015. Entrada Systems’ expertise in delivering complex, custom-designed façade solutions played a pivotal role in realising the project’s architectural vision.

Have A Project In Mind?

Get in touch with us today for a consultation!

Contact